PRE - Scheduled Service
(Sign up with MAC's seasonal Round-up Lake Schedule)
|
Product
|
*Estimated Rate
|
Description
|
Aluminum Dock
|
$5 / linear foot
|
Installation or removal includes proper leveling and adjusting.
|
Steel Docks
Must schedule a pre-inspection. Not all steel docks are removable.
|
$5 / linear foot
|
Installation or removal includes proper leveling and adjusting.
|
Boat / Pontoon Lift
|
$200 / each
|
Installation or removal includes proper leveling and adjusting.
|
Personal Watercraft Lift
|
$100 / each
|
Installation or removal includes proper leveling and adjusting.
|
Personal Watercraft floating Ports/Swim Rafts
|
$100 / each
|
Installation or removal
|
Canopy Fabric (Excludes Maxis)
|
$75
|
Installation or removal of canopy fabric on lift.
|
Maxis Canopy Fabric
|
$200
|
Installation or removal of Maxis canopy fabric on lift.
|
*Actual cost may vary. This is a guide to estimate the cost.
SERVICE CALL
(Request for service not during MAC's seasonal Round-up Lake Schedule)
|
Product
|
*Estimated Rate
|
Description
|
Dock / Lift recovery or service call
|
Barge: $500
+
Labor Rate: $75/ hour per person
+
Mileage: $.60 per mile
+
Fuel Surcharge $25
|
Recovery, inspection and set up of the product. (Set up in the original location if determined to be undamaged/ safe)
|
Boat / Pontoon Recovery
|
Barge: $1,000
+
Labor Rate: $75/ hour per person
+
Mileage: $.60 per mile
+
Fuel Surcharge $25
|
Installation or removal includes proper leveling and adjusting.
|
*Actual cost may vary. This is a guide to estimate the cost.